Ohio State Football Stadium, Columbus, Ohio, USA



TRIO 330 on KGF 240 climbing scaffold   
Fast climbing cycle for walls of great height

College Football has always been very popular in the USA, above all at Ohio State University. The stadium, built in 1922, was renovated and the capacity of the spectator stands increased by 8,000.

Apart from the 33.53 m high elevator tower at the southern end zone, PERI provided the site formwork service for altogether eight 28.40 m high staircases.

The site used 2,508 m² of TRIO 330 large panel units. Two extended 3.30 m high units, in connection with KGF 240 climbing brackets achieved fast concreting cycles with heights of 6.58 m. Time was saved in moving them because formwork and brackets could be raised to the next lift in one movement.

PERI Systems In Use
  • TRIO 330
  • The ideal choice of materials, delivery on time and continual dialogue with the site, both before and during the construction, were important for this project being effortlessly completed within the calculated time schedule.
    Contractors: Joint Venture of Kokosing Construction, Fredericktown and P.J. Dick, Pittsburgh
    Field Service: PERI USA, Cincinnati