PERI Formwork Systems, Inc., Projects - The Mark, San Diego, California

Housing

PERI Formwork Systems, Inc., Projects - The Mark, San Diego, California PERI Formwork Systems, Inc., Projects - The Mark, San Diego, California

The Mark, San Diego, California



SKYDECK and UNIPORTAL
for Every Slab

The 32 level 'The Mark' is one of the latest condominium high-rises to emerge in downtown San Diego. The residential tower overlies a larger courtyard community. These are all situated over a 3 level 65,000 ft² (6,039 m²) underground parking garage with numerous graded ramps, drop panels and beams.

The large open facades has made UNIPORTAL, the adaptable PERI table system, ideal for the 7.7 ft (2.29 m) cantilevered slab edges of this job. SKYDECK, the modular aluminum panel slab system was quickly adapted to the challenging and constantly changing interior slab areas around the core.

PERI Systems In Use
  • UNIPORTAL Tableforms
  • SKYDECK Aluminum Slab Formwork System

  • Wes Reimers


    Field Engineer

    “This job was my first experience ever with PERI. The engineering we received from PERI allowed us to quickly form the very difficult floor plans of this structure, including the especially challenging main level.”

    Contractor: Hensel Phelps Construction Co., Irvine
    Field Service: PERI Irvine
    Field Service: PERI Formwork Systems, Inc., USA
    PERI scope 02/2006, USA, Canada