|
A crew consisting of approximately 50 men, worked around the clock setting up over 1,212,542 lbs (552,000 kg) of PERI UP scaffolding to keep up with the demand of over 15 sub trades at this site.
|
|
The painting of the elevated water tower in Barrie was a challenge for the contractor due to the fact that a large automobile dealership was directly below.
|
|
The new administration complex for the Deutschen Lufthansa AG at Frankfurt Airport is formed by eight modular buildings connected by patios and indoor gardens.
|
|
In the town of Farum, near Copenhagen, Denmark, there is an extensive housing project comprising of numerous blocks of terraced apartments with landscaped flat roofs.
|
|
The Catholic church of St. Ludwig in Darmstadt was built in classical style and modelled on the Pantheon in Rome. The dome itself rises to a height of 35 metres.
|