PERI Formwork Systems, Inc., Projects - Water Reservoir, Aprilia, Italy

 
1 | 2 | 3 | 4 | 5 | 6 | 7
back to project

Water Reservoir, Aprilia, Italy

After concreting on the base the container (1,350 t) was pulled up over hawsers and twelve winches powered by hydraulic cylinders, to connect with the core and then fixed.