The Regatta, Chicago, Illinois

Incorporating PERI’s know-how on this project enabled James McHugh to keep schedule a priority. The main placing boom located in the middle of the floor was designed to be carried by the Automatic Climbing System, eliminating the extra crane time needed to move the system separately.