PERI Formwork Systems, Inc., Projects - Block Y Residential Facility, Chicago, USA

Housing

 
1 | 2 | 3 | 4 | 5 | 6 | 7
back to project

Block Y Residential Facility, Chicago, USA

MP 625 MULTIPROP allows the required floor height (5.49 m here) to be quickly adapted. Despite large supporting heights (max. 6.25 m) and high loading capacity, the 33 kg prop can be easily moved.