Scaffolding Construction
|
||
PERI UP crane handled reinforcement scaffoldOn this 6.80 m high formwork, for fairfaced concrete, the PERI UP reinforcement scaffolds were used to produce a clean and flush joint between panels, fixing the reinforcement and pouring the concrete. |


