|
||
Water Tank Reservoir, Barrie, ONLeonard TawststjernaDupont Painting Contracting Ltd.: “The 150 ft high PERI UP scaffolding system worked very well. The plywood platform just below the tank and the complete enclosure contained all debris from sandblasting. We then attached hoses to the floor of PERI’s deck and all debris was swept into the hoses and down to the ground into large garbage bins.” |


