PERI Formwork Systems, Inc., Projects - Montreal Subway Tunnel (Phase S-04), Montreal, Quebec

 
1 | 2 | 3 | 4
back to project

Montreal Subway Tunnel (Phase S-04), Montreal, Quebec

Luc Vachon,
Superintendent:
“Using PERI’s formwork on such a confined site, demonstrated the flexibility of the system to maneuver inside the right angled tunnels both very easily and quickly.”