Toulnustouc Hydro Electric Power Project, Northern QuebecPERI GRV system, utilized for the tunnel roof. The formwork employed had to be versatile enough to meet the strict tolerances specified by Hydro Quebec (1/8”, 3 mm) while being able to withstand enormous concrete loads from slabs up to 10’(3.05 m) deep. |