PERI Formwork Systems, Inc., Projects - Guthrie Theater on the River, Minneapolis, MN

Cultural Buildings

 
1 | 2 | 3
back to project

Guthrie Theater on the River, Minneapolis, MN

UNIPORTAL tables were used on the 1st floor which had a 32 ft (10 m) shoring height because they could be assembled on the ground with the posts added underneath while the table was suspended from the crane, thereby saving significant labor cost.