PERI Formwork Systems, Inc., Projects - Bridge over river Drava, Maribor, Slovenia

Scaffolding Construction

 
1 | 2 | 3
 
back to project

Bridge over river Drava, Maribor, Slovenia

The decks with integrated lock against lift off reduces erection time and increases safety. The bottomless transom allows debris to pass through and not to build up, leaving the transom clear to receive decks.