PERI Formwork Systems, Inc., Projects - Engstlige Tunnel, Frutigen, Switzerland

Tunnels

 
1 | 2 | 3 | 4 | 5 | 6
back to project
 
1 | 2 | 3 | 4 | 5 | 6
back to project

Engstlige Tunnel, Frutigen, Switzerland

Return walls with conical cross-sections form the tunnel portal as the rail track runs into the tunnel. Forming was done using stacked TRIO elements. These could be moved in large gangs, which saved time.