PERI Formwork Systems, Inc., Projects - Bridge over the river Havel, Berlin, Germany

Scaffolding Construction

 
1 | 2 | 3 | 4 | 5
back to project

Bridge over the river Havel, Berlin, Germany

PERI GT 24 wooden girders were used to transfer the heavy loads to the cross heads. Double 1.80 m long GT 24, with a self weight of 2 x 10 kg, can carry a maximum load of 56 kN.