PERI Formwork Systems, Inc., Projects - Toulnustouc Dam and Power Plant, Northern Quebec, Canada

Water Retaining Structures

 
1 | 2 | 3
 
back to project

Toulnustouc Dam and Power Plant, Northern Quebec, Canada

Using the tie-less GRV system with a radius of 18 ft (5.5 m), PERI was able to provide Aecon with a pre-assembled solution to form the entrance area for a diversion tunnel.