PERI Formwork Systems, Inc., Projects - Kuhn Drain GWK Drainage Project, Detroit, MI

 
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11
back to project

Kuhn Drain GWK Drainage Project, Detroit, MI

The TRIO wall formwork system was able to accommodate the battered walls because of the angle of variation achieved using taper ties.