PERI Formwork Systems, Inc., Projects - Kuhn Drain GWK Drainage Project, Detroit, MI

Water Retaining Structures

 
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11
back to project

Kuhn Drain GWK Drainage Project, Detroit, MI

The few pieces required to assemble MULTIPROP Towers minimizes material handling on site.