|
||
“Viaduc de Millau” Motorway Bridge, FranceThe PERI solution: only one anchor position in the concrete (2nd position above the concrete joint) which reduced shut-tering time and resulted in a 50% reduction in anchor positions. In spite of the difficult joint and anchor configuration the custom steel formwork produced an excellent surface finish. |


