“Viaduc de Millau” Motorway Bridge, France

The PERI solution: only one anchor position in the concrete (2nd position above the concrete joint) which reduced shut-tering time and resulted in a 50% reduction in anchor positions. In spite of the difficult joint and anchor configuration the custom steel formwork produced an excellent surface finish.