Multi-Storey Buildings
|
||
Bannockburn Center at College Park, Bannockburn, IL, USAEarly stripping with the SKYDECK drophead after only two days (depending on the thickness of the slab and strength of concrete). The site is able to reduce stocks, because the beams and panels are free for the next cycle after this short time. |


