Multi-Storey Buildings
|
||
The Bracebridge Center III in Wilmington, DE, USAGrade beams and pile caps are formed monolithically using PERI TRIO. The ties consists at the bottom of the PERI perforated foundation tie strapping and at the top of the PERI top tie bracket with a tie rod. |


