|
||
Public foot bridge, Barcelona, SpainThe solution was to construct a bridge with three spans, two by 12.00 m and one by 14.00 m length in PERI UP Rosett. |
|
||
Public foot bridge, Barcelona, SpainThe solution was to construct a bridge with three spans, two by 12.00 m and one by 14.00 m length in PERI UP Rosett. |