PERI Formwork Systems, Inc., Projects - Cathedral, Oviedo, Spain

Scaffolding Construction

 
1 | 2 | 3 | 4 | 5 | 6 | 7
back to project

Cathedral, Oviedo, Spain

By using cantilevers and console brackets the working platform steps in from a maximum diameter of 6.50 m at 47.00 m level to 3.50 m at 66.00 m level.