|
||
Cross of the Third Millennium, Coquimbo, ChileThe loads of the 750 t, 7.50 m thick supporting slab below the stem was safely carried by 38 ST 100 stacking towers. The three 450 inclined legs were formed with PERI HANDSET. |
|
||
Cross of the Third Millennium, Coquimbo, ChileThe loads of the 750 t, 7.50 m thick supporting slab below the stem was safely carried by 38 ST 100 stacking towers. The three 450 inclined legs were formed with PERI HANDSET. |