PERI Formwork Systems, Inc., Projects - Cross of the Third Millennium, Coquimbo, Chile

Towers

 
1 | 2 | 3 | 4 | 5
back to project
 
1 | 2 | 3 | 4 | 5
back to project

Cross of the Third Millennium, Coquimbo, Chile

The loads of the 750 t, 7.50 m thick supporting slab below the stem was safely carried by 38 ST 100 stacking towers. The three 450 inclined legs were formed with PERI HANDSET.