PERI Formwork Systems, Inc., Projects - East Brampton Reservoir Extension, Brampton, ON, Canada

 
1 | 2 | 3
back to project

East Brampton Reservoir Extension, Brampton, ON, Canada

The VARIO panels –with scaffold brackets and push-pull props– are made up with 23''3" (7.10 m) long GT 24 girders.