PERI Formwork Systems, Inc., Projects - Danube Bridge BAB A8 near Leipheim, Germany

 
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8
back to project

Danube Bridge BAB A8 near Leipheim, Germany

Hollow pier abutments on the river banks, climbed with VARIO on KG 240. The adjustment to the oval-shaped ends was made with standard VARIO components and doubling up.