Two external vibrators were fixed to the formwork spaced 3'-6" (1.08 m) apart vertically and 3'-11" (1.20 m) horizon- tally. A roof anchor, set in the previously poured section, was used to stabilize the unit in the longitudinal direction during concreting of the graded levels.