Harry Rosen Expansion Project, Toronto, Ontario PERI designed, supplied and installed MULTIPROPs and GT 24 girders in combination with PERI UP scaffolding components to provide a safe pedestrian walkway for the 2 story expansion of the well known prestigious Harry Rosen Clothiers in Toronto.
Goreway Station Combined Cycle Thermal Power Plant Project, Brampton, Ontario A crew consisting of approximately 50 men, worked around the clock setting up over 1,212,542 lbs (552,000 kg) of PERI UP scaffolding to keep up with the demand of over 15 sub trades at this site.
Bell North Point, Montreal, Quebec The versatility of the SKYDECK allowed it to be easily adapted to the 1.8 ft (55 cm) drops surrounding the columns, as well as the 2.8 ft (85 cm) downcast beams around the slab edges.
Montfort Hospital Expansion Project, Ottawa, Ontario The 10,000 ft² (930 m²) 7 story West side expansion is formed using SKYDECK in two seperate pours with floor heights ranging from 13 ft - 14 ft (4.00 m - 4.30 m).
RBC Centre, Toronto, Ontario The project also features an adjoining 10 story podium structure, which has a typical office floor plate of 37,000 ft² (3,437 m²) and 3 levels of underground parking.
The following pages show examples from typical construction sectors. However, the photographs only show the situation on site at the time the photos were taken and although they may offer suggestions, they are therefore not to be taken as indicating the correct way formwork and scaffolding should be used particularly where safety and other details are concerned.