Only 1 tie through the concrete
All TRIO Housing formwork activities can be carried out on the ground.
Integrated accessory
Securely mounted to the element: - crane lifting gear - push-pull prop connections - foldable concreting platform
All operations can be done frome the base single sided
With ties having to be inserted from one side only as well as securely fixed foldable concreting platform, storage containers for connecting components and ties make TRIO HOUSING very cost-effective.
Panel widths
Large elements for creating concrete surfaces suitable for wallpapering. The formlining is screwed on from the back which leaves no nail or screw markings.
|