|
The cost-effective system for use as a shoring tower
The PD 8 shoring tower has been designed for large heights and loads of up to 62 kN/leg. The same frames are used as for the slab tables. The PD 8 shoring tower can be assembled horizontally on the ground. Both PD 8 systems, shoring tower and slab table, have been type tested which means expensive and time-consuming static calculations are unnecessary.
|
Advantages
|
|
Fast assembly
Quick to assemble with only 2 different steel frames (R150, R110).
Easy handling
Individual parts are simply slotted together using the frame connector.
High load-bearing capacity
The permissible load-bearing capacity is over 60 kN per leg which complies fully with the type test.
|
|
|
References
|
|
Solid Fuel Power Station, Manjung, Malaysia
|
|
|
|