ACS G Self Climbing System
|
|
|
ACS G Self Climbing System
The loads from the climbing scaffold are safely transferred through the anchors into the building. The high load capacity of the building authority-approved PERI climbing anchors allows the system to be climbed one day after concreting.
The optimum climbing shoe and anchor type are selected – as well as determining the position – after having taken into consideration individual factors such as the structure of the building, loading, wall thickness and the required concrete hardness. All compression and tension forces can now be safely transferred into the wall.
|
|