PERI scope
Issue 01/2005
The State Place Condominium Project, Chicago, IL
Innovative Box Culvert Solution for Balconies
Guthrie Theater on the River, Minneapolis, MN
Simple Solution to a Complex Building Structure
The Shoreham, Chicago, IL
Walls and Slabs Poured Monolithically Using ACS-G
The Lancaster, Chicago, IL
PERI’s ACS and SKYDECK Systems Achieve 3 Day Pour Cycle
Broadway 655, San Diego, CA
ACS-R/P: Self-Climbing Core Formwork That Facilitate Installation of Pre-Tied Rebar
Residential and Community Facility St. Marks Avenue, Brooklyn, NY
Easy to Use Slab Forming System and Engineering Service for Higher Efficiency on-site
Hyatt Hotel Convention Center, Denver, CO
PERI Provides Versatility, Efficiency, and Safety Needed to Maintain 4-Day Floor Cycle
7 World Trade Center New York, NY
Unique Solution – Climbing Inside a Steel Structure with PERI ACS
Waste Water Treatment Plant, Colorado Springs, CO
Versatile Radius and Wall Forms Save Costs on Waste Water Treatment
Facility Chaparral Water Treatment Plant, Scottsdale, AZ
TRIO Wall Formwork: Labor Savings Achieved Using a Modular and Flexible System
Comfort Suites Hotel, Grapevine, TX
Eleven Minutes to Move PERI UNIPORTAL Tables to the Next Floor
West Side Combined Sewer Overflow Project, Portland, OR
Simple Solution for Concreting from Top Down: Inverted Single-sided SKS Platforms
National Underground Railroad Freedom Center, Cincinnati, OH
Architectural Concrete Finish Achieved Using RUNDFLEX Circular Wall Formwork System
Toulnustouc Hydro Electric Power Project, Northern Quebec
Versatile Products and Precision of PERI Prove Successful on new Quebec Hydro Project
Concord Cityplace Condominium Project, Toronto, ON
SKYDECK and TRIO Saves Time on Canada’s Largest Residential Construction Project
Montreal Subway Tunnel (Phase S-04), Montreal, Quebec
PERI’s Wide Range of Versatile Equipment Delivers The Best Formwork Solution at Montreal’s new Subway Line Project
Water Tank Reservoir, Barrie, ON
PERI UP Rosett: One System for a Wide Range of Applications
Innovative Box Culvert Solution for Balconies
Guthrie Theater on the River, Minneapolis, MN
Simple Solution to a Complex Building Structure
The Shoreham, Chicago, IL
Walls and Slabs Poured Monolithically Using ACS-G
The Lancaster, Chicago, IL
PERI’s ACS and SKYDECK Systems Achieve 3 Day Pour Cycle
Broadway 655, San Diego, CA
ACS-R/P: Self-Climbing Core Formwork That Facilitate Installation of Pre-Tied Rebar
Residential and Community Facility St. Marks Avenue, Brooklyn, NY
Easy to Use Slab Forming System and Engineering Service for Higher Efficiency on-site
Hyatt Hotel Convention Center, Denver, CO
PERI Provides Versatility, Efficiency, and Safety Needed to Maintain 4-Day Floor Cycle
7 World Trade Center New York, NY
Unique Solution – Climbing Inside a Steel Structure with PERI ACS
Waste Water Treatment Plant, Colorado Springs, CO
Versatile Radius and Wall Forms Save Costs on Waste Water Treatment
Facility Chaparral Water Treatment Plant, Scottsdale, AZ
TRIO Wall Formwork: Labor Savings Achieved Using a Modular and Flexible System
Comfort Suites Hotel, Grapevine, TX
Eleven Minutes to Move PERI UNIPORTAL Tables to the Next Floor
West Side Combined Sewer Overflow Project, Portland, OR
Simple Solution for Concreting from Top Down: Inverted Single-sided SKS Platforms
National Underground Railroad Freedom Center, Cincinnati, OH
Architectural Concrete Finish Achieved Using RUNDFLEX Circular Wall Formwork System
Toulnustouc Hydro Electric Power Project, Northern Quebec
Versatile Products and Precision of PERI Prove Successful on new Quebec Hydro Project
Concord Cityplace Condominium Project, Toronto, ON
SKYDECK and TRIO Saves Time on Canada’s Largest Residential Construction Project
Montreal Subway Tunnel (Phase S-04), Montreal, Quebec
PERI’s Wide Range of Versatile Equipment Delivers The Best Formwork Solution at Montreal’s new Subway Line Project
Water Tank Reservoir, Barrie, ON
PERI UP Rosett: One System for a Wide Range of Applications
