Shoal Creek Water Pollution Control Plant (WPCP), Atlanta, GA
The Versatile PERI TRIO Wall Formwork Adapts Easily to Various Sized Structures
4th Ave. Jail, Phoenix, AZ
Architectural Concrete Finish Achieved with PERI RAPID Column Formwork System
ASU West Campus Extension, Phoenix, AZ
RUNDFLEX and TRIO for curved Walls with integrated Pilasters
Philadelphia Airport – Double Helix Parking Ramp
PERI UNIPORTAL and MULTIFLEX Tables Provide Flying Formwork Solution
The Residences At The Ritz-Carlton, Grand Cayman
Critical Schedule Demands Quick Slab Forming System: PERI SKYDECK
Potomac Center, Washington, D.C.
Unexpected Jobsite Adjustments Made Easy Using PERI SKYDECK
Optima View Towers, Evanston, IL
Accelerated Schedule Achieved Using PERI SKYDECK Slab Formwork System
Humphrey Light Rail Terminal Platform and Core,...
Large Wall Formwork Gangs increase Efficiency – PERI TRIO
Children’s Mercy Hospital Expansion, Kansas City, MO
TRIO Wall Formwork System: Few Components Results in Fast Assembly and Cycle Times
St. James Condominium Tower, Philadelphia, PA
Custom Steel Formwork Produces Architectural Finish for Exceptional Facade Design
Arthur Ravenel Jr. Bridge, Charleston, SC (Title)
Safe, Accurate and Fast PERI ACS for 175 m high Bridge Piers
Kuhn Drain GWK Drainage Project, Detroit, MI
Michigan’s Largest Water Retention Facility: Built Using PERI’s Formwork Know-How
Toulnustouc Dam and Power Plant, Northern Quebec, Canada
Pre-Assembled Custom Tunnel Formwork Allows Hydro Quebec Project to Continue on Schedule
Phase 1 of New Terminal 1 – Toronto Pearson Airport, Toronto, ON
PERI UP: Meeting All Safety Requirements With Faster Erection
1 King Street West, Toronto, ON
Slim TRIO Profile Allows Contractor to Build on a Very Confined Site
The Versatile PERI TRIO Wall Formwork Adapts Easily to Various Sized Structures
4th Ave. Jail, Phoenix, AZ
Architectural Concrete Finish Achieved with PERI RAPID Column Formwork System
ASU West Campus Extension, Phoenix, AZ
RUNDFLEX and TRIO for curved Walls with integrated Pilasters
Philadelphia Airport – Double Helix Parking Ramp
PERI UNIPORTAL and MULTIFLEX Tables Provide Flying Formwork Solution
The Residences At The Ritz-Carlton, Grand Cayman
Critical Schedule Demands Quick Slab Forming System: PERI SKYDECK
Potomac Center, Washington, D.C.
Unexpected Jobsite Adjustments Made Easy Using PERI SKYDECK
Optima View Towers, Evanston, IL
Accelerated Schedule Achieved Using PERI SKYDECK Slab Formwork System
Humphrey Light Rail Terminal Platform and Core,...
Large Wall Formwork Gangs increase Efficiency – PERI TRIO
Children’s Mercy Hospital Expansion, Kansas City, MO
TRIO Wall Formwork System: Few Components Results in Fast Assembly and Cycle Times
St. James Condominium Tower, Philadelphia, PA
Custom Steel Formwork Produces Architectural Finish for Exceptional Facade Design
Arthur Ravenel Jr. Bridge, Charleston, SC (Title)
Safe, Accurate and Fast PERI ACS for 175 m high Bridge Piers
Kuhn Drain GWK Drainage Project, Detroit, MI
Michigan’s Largest Water Retention Facility: Built Using PERI’s Formwork Know-How
Toulnustouc Dam and Power Plant, Northern Quebec, Canada
Pre-Assembled Custom Tunnel Formwork Allows Hydro Quebec Project to Continue on Schedule
Phase 1 of New Terminal 1 – Toronto Pearson Airport, Toronto, ON
PERI UP: Meeting All Safety Requirements With Faster Erection
1 King Street West, Toronto, ON
Slim TRIO Profile Allows Contractor to Build on a Very Confined Site
