PERI scope 01/2004, USA Canada
PERI scope 01/2004, USA, Canada

The Formwork Engineering Magazine Issue 01/2004

Successful construction with PERI

Get a Free Copy!
Shoal Creek Water Pollution Control Plant (WPCP), Atlanta, GA
The Versatile PERI TRIO Wall Formwork Adapts Easily to Various Sized Structures

4th Ave. Jail, Phoenix, AZ
Architectural Concrete Finish Achieved with PERI RAPID Column Formwork System

ASU West Campus Extension, Phoenix, AZ
RUNDFLEX and TRIO for curved Walls with integrated Pilasters

Philadelphia Airport – Double Helix Parking Ramp
PERI UNIPORTAL and MULTIFLEX Tables Provide Flying Formwork Solution

The Residences At The Ritz-Carlton, Grand Cayman
Critical Schedule Demands Quick Slab Forming System: PERI SKYDECK

Potomac Center, Washington, D.C.
Unexpected Jobsite Adjustments Made Easy Using PERI SKYDECK

Optima View Towers, Evanston, IL
Accelerated Schedule Achieved Using PERI SKYDECK Slab Formwork System

Humphrey Light Rail Terminal Platform and Core,...
Large Wall Formwork Gangs increase Efficiency – PERI TRIO

Children’s Mercy Hospital Expansion, Kansas City, MO
TRIO Wall Formwork System: Few Components Results in Fast Assembly and Cycle Times

St. James Condominium Tower, Philadelphia, PA
Custom Steel Formwork Produces Architectural Finish for Exceptional Facade Design

Arthur Ravenel Jr. Bridge, Charleston, SC (Title)
Safe, Accurate and Fast PERI ACS for 175 m high Bridge Piers

Kuhn Drain GWK Drainage Project, Detroit, MI
Michigan’s Largest Water Retention Facility: Built Using PERI’s Formwork Know-How

Toulnustouc Dam and Power Plant, Northern Quebec, Canada
Pre-Assembled Custom Tunnel Formwork Allows Hydro Quebec Project to Continue on Schedule

Phase 1 of New Terminal 1 – Toronto Pearson Airport, Toronto, ON
PERI UP: Meeting All Safety Requirements With Faster Erection

1 King Street West, Toronto, ON
Slim TRIO Profile Allows Contractor to Build on a Very Confined Site